New Arrivals/Restock

4-Hole Art Pencil Sharpener,Sketch Sharpener,Long Lead Grinding Tool,Pencil Grinder,Suitable for Artists and Drawing Enthusiasts (F.2 Pieces(Pink))

flash sale iconLimited Time Sale
Until the end
20
53
26

US$6.58 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
Used  US$4.39
quantity

Product details

Management number 233631381 Release Date 2026/06/27 List Price US$4.39 Model Number 233631381
Category
  • Long Point Pencil Sharpener Combo Set: This portable art kit includes a 4-hole professional drawing sharpener and a lead pointer—a convenient duo for artists creating sketch works. It meets daily needs and can also be shared with friends and family.
  • Portable Art Sharpening Kit: The handheld sharpener features a 4-hole design that allows more precise control over tip length compared to crank or electric sharpeners. Paired with the lead pointer, which grinds sketching pencils to a fine tapered point, its compact size makes it easy to carry anywhere.
  • High-Quality Art Supplies Set: The 4-hole sharpener is made of premium transparent plastic, while the lead pointer features a stainless steel grinding surface—both durable and built for long-term use.
  • Versatile Art Set for Multiple Drawing Tools: Suitable for sketching pencils, charcoal pencils, and colored pencils.
  • Clean & Tidy Drawing Supplies Kit: Both tools come with built-in shavings storage to keep your creative space clean and tidy.
ASIN B0FYCDKR3B
Item Weight 2.89 ounces
Manufacturer Generic
Item model number Ps-4h-blu
Product Dimensions 3.2 x 3.2 x 4.3 inches

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review