Limited Time SaleUS$9.59 cheaper than the new price!!
| Management number | 237783680 | Release Date | 2026/07/10 | List Price | US$6.40 | Model Number | 237783680 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Miracle Balls is a classic magic effect reimagined in a compact, close-up format, combining visual mystery, audience interaction, and lighthearted presentation. This timeless routine features a simple yet deceptive sequence where three colored balls repeatedly change positions inside a clear tube, creating an engaging and impossible visual experience. The effect begins with the balls placed inside a transparent tube mounted on a base. Once covered, the balls mysteriously change order—again and again—under seemingly fair conditions. The top ball visibly travels to the bottom, and the sequence continues in a surprising and entertaining manner. Even when one ball appears to vanish, it reappears unexpectedly within the tube, adding a final moment of astonishment. Designed for ease of use and consistent performance, this prop allows you to focus on presentation, timing, and audience engagement. Its compact size makes it ideal for close-up settings while still delivering a strong visual impact. Suitable for magicians, hobbyists, and performers looking to add a classic, interactive routine to their repertoire.
| ASIN | B0GWPHHGY9 |
|---|---|
| Brand Name | ZQION |
| Unit Count | 1.0 Count |
| Manufacturer | ZQION |
| Material Type | Plastic |
| Item Dimensions | 2.5 x 2 x 2 inches |
| Included Components | gimmicks and tutorial video |
| Is Assembly Required | No |
| Age Range Description | adult only |
| Educational Objective | Creative |
| Manufacturer Part Number | lege-123 |
| Manufacturer Maximum Age MONTHS | 450 |
| Manufacturer Minimum Age MONTHS | 220 |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form